​​O2EPCM, Inc. 
O2 Engineering, Projects and Construction Management, Inc.

Certified SBE, WBE, WOSB, MBE, DBE, LSBE, CBE and Registered SAM Firm

Current O2EPCM, Inc. projects include:

  • $2.8 Billion Los Angeles Stadium and Entertainment Development at Hollywood Park – Los Angeles Rams and Chargers Stadium, Inglewood, California

  • $6.3 Billion Los Angeles Community College District (LACCD) Prime Multiple Award Task Order Contract for District-Wide Professional Services - On-call Project Management/Construction Management Services

  • Los Angeles Community College District (LACCD) Multiple Award Task Order Contract District-Wide Constructability Review and Cost Estimating Consulting Services

  • ​California State University Office of the Chancellor Project Management Services Job Order Contracts (JOC) for Systemwide Minor Capital Projects

  • County of Orange, Orange County Public Works - Qualified Vendor List (QVL) for Architect-Engineer Multiple Disciplines – On-call Project Management/Construction Management Services​

  • ​San Gabriel Valley Water Company Staff Augmentation As-Needed Support Services

  • ​Los Angeles World Airports LAX Terminal Cores & Automated People Mover (APM) Interface Project


O2EPCM, Inc. Founder, President and CEO project experience as the Business Development Pursuit Lead, Proposal Manager, Executive Program Manager and Senior Project Manager includes:

  • Caltrans District 7 – Architectural & Engineering (A&E) On-Call Construction Engineering, Construction Inspection Support & CPM Analyses Services
  • City of Los Angeles, Los Angeles World Airports (LAWA)
    • Program Management, Project Management, Construction Management, and Project Controls Support Services – Project/Construction Management Services - Small Size Category for LAX and Van Nuys Airports Capital Improvement Projects (Project Management Business Administrative)
  • City of Los Angeles, Bureau of Engineering (BOE) Pre-Qualified Wastewater and Environmental Engineering Consultants List
    • Pre-Qualified Wastewater and Environmental Engineering Consultants List - TOS No. 52: Project Management, Construction Management, Design and Process Engineering Support Services
  • City of Los Angeles, Los Angeles Sanitation (LASAN)
    • On-Call List of Consultants - TOS-No.6: Municipal Solid Waste Collection Implementation of Planned Exclusive Franchise System
  • City of Los Angeles Minority Business Development Agency (MBDA) Mayor Garcetti’s Office & USC - Minority Business Awards Graphic Design and Printing
  • City of Los Angeles, Los Angeles Department of Water & Power (LADWP)
    • LADWP Owner’s Representative Services for Repowering Related Projects
    • LADWP Water Engineering & Technical Services Supplemental Construction Management Services
  • City of Long Beach
    • Engineering Services for Various Development Projects at Long Beach Airport
    • Job Order Contracting Program Support
  • Los Angeles Community College District (LACCD) – Leading Engineering Education for the Future in Los Angeles (LEEF-LA) Internship Program
  • Water Replenishment District (WRD) On-Call Professional Engr. Services for the WRD Safe Drinking  Water Program and Various Engineering/Technical Related Services

O2EPCM, Inc. Founder, President and CEO’s other project experience includes:

  • Amgen Thousand Oaks Office Site Development Phase II and Façade Improvements Project
  • County of Los Angeles Department of Public Works (LADPW), Traffic and Lighting - Design Division
  • City of Arcadia Sanitary Sewer System Sewer Master Plan and Hydraulic Modeling Project
  • City of Corona Wastewater Treatment Plant No. 3 Required Contact Time for Chlorine Contact Basin and Relocation of Chlorine Analyzer Sampling Point Project
  • City of Los Angeles, Los Angeles World Airports (LAWA)
    • LAX Tom Bradley International Terminal West Gates and Core Projects, Silver LEED Project
  • City of Los Angeles Department of Water & Power (LADWP) Lower Stone Canyon Reservoir Water Quality Improvement Project
  • City of Los Angeles, Los Angeles Sanitation (LASAN)
    • Integrated Resources Plan (IRP) 20-Year Phase II Facilities Master Plan; Wastewater Collection Systems/Treatment Task; Infiltration/Inflow (I/I) Peer Review Workshop Coordinator; Sewer Flow Estimating Model (SFEM)
    • Condition Assessment Program for Wastewater Collection System and Wastewater Engineering and Stormwater Infrastructure
    • Capacity, Management, Operations and Maintenance (CMOM) Program
    • d/D Study and Proposed Buckingham Relief Sewer Project
    • Gauging Program Data Management
    • Echo Park Lake Restoration
  • City of Los Angeles Los Angeles Zoo Stormwater Best Management Practices (BMPs) Study Project
  • City and County of San Francisco, Department of Public Works Bureau of Construction Management (Islis Creek Project)
  • City of Riverside and the City of Albuquerque Backup Power Source/Cogeneration Projects at the City's Regional Water Quality Control Plants
  • City of Riverside Recycling Water 1992 Master Plan
  • Los Angeles World Airport Ontario International Airport Terminals 2 and 4 In-Line Baggage Screening Facility Project
  • LA Live Hotel & Residences in Downtown Los Angeles, California
    • Ritz Carlton Restaurant and Lounge for the 54 Story Hotel and Residential Tower
    • LA Live Hotel & Residences – Ritz Carlton Spa for the 54 Story Hotel and Residential Tower
    • LA Live – The Cinemas At LA Live (Regal Cinemas), 4-Story Fourteen Screen Cinema Complex (1 Premiere Theatre and 13 Regular Theatres; Two Cinema Levels with Mezzanine access to Projection Rooms)
  • Los Angeles Unified School District (LAUSD)
    • LAUSD Central Region High School #13
    • LAUSD Bundled Eight Hooper Primary Center - 2-Story Classroom Building and Subterranean Parking Garage
  • Integrated Resources Plan and Caltrans Water Utility Relocation Project
  • Marine Corps Air Station El Toro, California Storm Water Management and Hydraulic Modeling
  • Miller Children’s Hospital Long Beach - 4-Story Expansion
  • Southern California Water Company Water Supply and Pipeline Projects – Design of 100 MGD Water Treatment Plant
  • The Primm Valley Golf Course at the Nevada/California State line Project
  • The Southern Nevada Water Authority (SNWA) Program River Mountain Water Treatment Plant (Part of a Montgomery Watson/CH2M Hill Joint Venture design team)
  • United States Bureau of Reclamation Southern California Water Recycling Projects Initiative – Financial Support Opportunities
  • Western Riverside County Regional Wastewater Treatment Plant (Design-Build)​

Projects